CONCRETE / MASONRY / SHELL
THE WORK
BEHIND
THE BUILD.
From the first reinforcing bar to the roof structure. Concrete, block, steel and rough carpentry for the stages that bring a building together.
SEND YOUR PLANS TO MARIO ↗Plans. Site conditions. A clearly defined scope.

01 / TRADE SCOPES
BUILT FROM
THE GROUND UP.
A focused scope for each phase. Bring the drawings, details and quantities; review the labor, materials and sequence directly with Mario.
Reinforcing steel is included with concrete scope. Trusses and connections follow the project drawings and manufacturer details. Final scope, responsibilities and requirements are reviewed for each project.
02 / MATERIAL & METHOD
CONCRETE.
BLOCK. CONNECTIONS.
The work is in the details: formwork, reinforcement, masonry and the connections between them.



Construction reference photography from the Academia media library; shown to explain trade scope, not as a Mario & Bros project portfolio.
ON SITE / JAVIER PROJECT
REAL WORK.
UP CLOSE.
A closer look at the roof-deck work: wood, fastening and the details behind the finished surface.
THE CONCRETE STAGE
BEFORE THE FINISH.
THERE’S THE SHELL.
Pool and concrete repair scopes begin with the existing conditions and project details. Discuss concrete preparation, reinforcement and defined repair work with Mario.
DISCUSS YOUR SCOPE ↗
03 / FROM PLANS TO SCOPE
LET’S GET INTO
THE DETAILS.
- 01
Send the plans
Share drawings, project location, photos and the trade scope you need.
- 02
Review the job
Talk through access, site conditions, quantities, materials and project sequence.
- 03
Define the scope
Confirm inclusions, responsibilities, availability and next steps before work begins.
MARIO & BROS CONSTRUCTION
